Industrial
Gas Turbine (IGT) holiday assignment
So
far we have been given three report writing assignment for our one month school
break, that is for MIB, IT and now IGT and the IGT assignment goes like this:
Write a report by referring to the questions given
below:
1. Explain
with diagrams, the functions of the following gas turbines sections:
A. Inlet
section
B. Compressor
C. Combustion
system / chamber
D. Turbine
E. Exhaust
system and Exhaust diffuser
2. Identify
with diagram, the location and state the function for each of the turbine
section part which includes; fuel nozzles, flame detection equipment, spark
plugs, transition pieces, combustion liners and crossfire tubes.
3. Describe
briefly the following with respect to gas turbine maintenance.
A. The
three types of turbine inspections.
B. The
procedures of carrying out Hot Gas Path Inspection and what are the things to
be inspected
C. Using
Bore scope for gas turbine inspection, include diagram(s) and labels.
4. Explain
the following gas turbine fuel classifications.
A. Gas
Fuel: Natural gas, high calorific value gas, medium calorific value gas, and
low calorific value gas.
B. Liquid
Fuel: True distillate fuel, oil and bio-liquid fuels.
As usual like any report, this report requires a
proper report layout, contents, table of content page, introduction, cover page
(provided), conclusions if any and a proper referencing. By doing this properly
will be given 10 marks as a reward.
This assignment mark weighs 100% and will help in
our exam score mark as well.